Deliverables

 

#Deliverable Deliverable name Description Dissemination level (*) Delivery date (**) Public Abstract
D01 Project Development Plan (Is 1.0) This document constitutes the Project Development Plan for the DEMETRA project and consequently it provides the logic, the organisation and the definition of all activities that will be carried out in order to reach all objectives fixed in the frame of this program. PU T0 D01
D02 Project Development Plan (Is 2.0) Updated issue of D01 (D1.1) PU T0+3 D02
D03 Final Report This document contains all the information regarding the project: the project design, implementation, data analysis, results, discussion, and recommendation for the exploitation. CO T0+23 D03
D04 Executive Summary This document summarizes the whole project. It contains a brief statement of the project, , description of the experiments, concise analysis and main conclusions. PU T0+23
D05 Time Service User Needs Analysis This document identifies the user needs in terms of time dissemination and connects the needs versus the proposed time services. It will include a list of potential users, and the list of the organisations that accept to take part to the experimentation. CO T0+3 D05
D06 Time Service Demonstrator Specification This document presents in detail the requirements for the time service demonstrator realized in the frame of the DEMETRA project. CO T0+3 D06
D07 Core Infrastructure Design Definition This document is intended to present an overall definition of the Core Infrastructure design. It has three main objectives: 1) to present the Core Infrastructure architecture, 2) to allocate the specifications of the different components constituting the Core Infrastructure, 3) to provide the Core Infrastructure design and technical baseline CO T0+7 D07
D08 Core Infrastructure Interface Control Document This document aims to list all internal and external interfaces of the Core Infrastructure of the DEMETRA project CO T0+7 D08
D09 Time Reference Facility Design Definition This document is intended to present an overall definition of the Time Reference Facility design. It has three main objectives: 1) to present the Time Reference Facility architecture, 2) to allocate the specifications of the different components constituting the Time Reference Facility, 3) to provide the Time Reference Facility design and technical baseline. CO T0+7 D09
D10 Time Reference Facility Design Definition incl. Test Report Updated issue of D10(D6.2), including the Test Report of the Time Reference Facility. The test report presents the details of the verifications performed on the Time Reference Facility and their results. CO T0+11  D10
D11 Service Provision Facility Design Definition This document is intended to present an overall definition of the Service Provision Facility design. It has three main objectives: 1) to present the Service Provision Facility architecture, 2) to allocate the specifications of the different components constituting the Service Provision Facility, 3) to provide the Service Provision Facility design and technical baseline. CO T0+7 D11
D12 Service Provision Facility Design Definition incl. Test Report Updated issue of D11(D8.1), including the Test Report of the Service Provision Facility. The test report presents the details of the verifications performed on the Service Provision Facility and their results. CO T0+11  D12
D13 Service Validation Facility Design Definition This document is intended to present an overall definition of the Service Validation Facility design. It has three main objectives: 1) to present the Service Validation Facility architecture, 2) to allocate the specifications of the different components constituting the Service Validation Facility, 3) to provide the Service Validation Facility design and technical baseline. CO T0+7 D13
D14 Service Validation Facility Design Definition incl. Test Report Updated issue of D13(D7.1), including the Test Report of the Service Validation Facility. The test report presents the details of the verifications performed on the Service Validation Facility and their results CO T0+11 D14
D15 Service Infrastructure #1 Specification and Design This document presents in detail the requirements, the architecture and the design details for service infrastructure #1 realized in the frame of the DEMETRA project CO T0+7 D15
D16 Service Infrastructure #2 Specification and Design This document presents in detail the requirements, the architecture and the design details for service infrastructure #2 realized in the frame of the DEMETRA project. CO T0+7 D16
D17 Service Infrastructure #3 Specification and Design This document presents in detail the requirements, the architecture and the design details for service infrastructure #3 realized in the frame of the DEMETRA project. CO T0+7 D17
D18 Service Infrastructure #4 Specification and Design This document presents in detail the requirements, the architecture and the design details for service infrastructure #4 realized in the frame of the DEMETRA project. CO T0+7 D18
D19 Service Infrastructure #5 Specification and Design This document presents in detail the requirements, the architecture and the design details for service infrastructure #5 realized in the frame of the DEMETRA project. CO T0+7 D19
D20 Service Infrastructure #6 Specification and Design This document presents in detail the requirements, the architecture and the design details for service infrastructure #6 realized in the frame of the DEMETRA project. CO T0+7 D20
D21 Service Infrastructure #7 Specification and Design This document presents in detail the requirements, the architecture and the design details for service infrastructure #7 realized in the frame of the DEMETRA project. CO T0+7 D21
D22 Service Infrastructure #8 Specification and Design This document presents in detail the requirements, the architecture and the design details for service infrastructure #8 realized in the frame of the DEMETRA project. CO T0+7 D22
D23 Service Infrastructure #9 Specification and Design This document presents in detail the requirements, the architecture and the design details for service infrastructure #9 realized in the frame of the DEMETRA project. CO T0+7 D23
D24 Service Infrastructure #1 Spec. Design & Test Report Updated issue of D15 (D10.1), including the Test Report of the Service Infrastructure #n . The test report presents the details of the verifications performed on the Service Infrastructure #1 and their results. CO T0+11 D24
D25 Service Infrastructure #2 Spec. Design & Test Report Updated issue of D16 (D11.1), including the Test Report of the Service Infrastructure #n . The test report presents the details of the verifications performed on the Service Infrastructure #2 and their results. CO T0+11 D25
D26 Service Infrastructure #3 Spec. Design & Test Report Updated issue of D17 (D12.1), including the Test Report of the Service Infrastructure #n . The test report presents the details of the verifications performed on the Service Infrastructure #3 and their results. CO T0+11  D26
D27 Service Infrastructure #4 Spec. Design & Test Report Updated issue of D18 (D13.1), including the Test Report of the Service Infrastructure #n . The test report presents the details of the verifications performed on the Service Infrastructure #4 and their results. CO T0+11  D27
D28 Service Infrastructure #5 Spec. Design & Test Report Updated issue of D19 (D14.1), including the Test Report of the Service Infrastructure #n . The test report presents the details of the verifications performed on the Service Infrastructure #5 and their results. CO T0+11  D28
D29 Service Infrastructure #6 Spec. Design & Test Report Updated issue of D20 (D15.1), including the Test Report of the Service Infrastructure #n . The test report presents the details of the verifications performed on the Service Infrastructure #6 and their results. CO T0+11  D29
D30 Service Infrastructure #7 Spec. Design & Test Report Updated issue of D21 (D16.1), including the Test Report of the Service Infrastructure #n . The test report presents the details of the verifications performed on the Service Infrastructure #7 and their results. CO T0+11  D30
D31 Service Infrastructure #8 Spec. Design & Test Report Updated issue of D22 (D17.1), including the Test Report of the Service Infrastructure #n . The test report presents the details of the verifications performed on the Service Infrastructure #8 and their results. CO T0+11 D31
D32 Service Infrastructure #9 Spec. Design & Test Report Updated issue of D23 (D18.1), including the Test Report of the Service Infrastructure #n . The test report presents the details of the verifications performed on the Service Infrastructure #9 and their results. CO T0+11  D32
D33 Demonstrator Test Report This document presents the details of the verifications performed on the time service Demonstrator realized in the frame of the DEMETRA project and their results. CO T0+14 D33
D34 Experimentation Plan Definition This documents contains the definition and plan of the experimentation campaigns. CO T0+7 D34
D35 Experimentation Report 1 This document contains the details of the tests performed in the frame of the experimentations campaigns (part 1) CO T0+17 D35
D36 Experimentation Report 2 – Incl. Performance Report This document contains the details of the test performed in the frame of the experimentations campaigns and their results (part 2). CO T0+21 D36
D37 Business Plan and Market Analysis Report (Is.1) This document contains the a description of the proposed services, an analysis of the market sectors, an assessment of the competition, the innovation of the proposed services, and an analysis of the potential business models together with possible entry prices and costs. CO T0+14 D37
D38 Business Plan and Market Analysis Report (Is.2) Updated issue of D38(D23.1) CO T0+23 D38
D39 Impact and User Needs Assessment Report This document contains an assessment of the service impact on Galileo Infrastructure and service provisions, and a characterization of the user needs based on the experimentation campaign. The document will be organized by market segment. CO T0+23 D39

(*) PU: Public Document  –  CO: Confidential Document
(**) T0: January 2015